Working towards
a cleaner future
Paramount two
Wall hung condensing boiler
30 115kW
Installation, operation & maintenance manual
Aprill 2011
heating specialists
Vedere la pagina 0
1 2 3 4 5 6 ... 79 80

Sommario

Pagina 1 - Paramount two

Working towardsa cleaner futureParamount twoWall hung condensing boiler30 – 115kWInstallation, operation & maintenance manualAprill 2011heating sp

Pagina 2 - Table of contents

Technical Data10 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhTable 1: Dimensions and connections PARAMOUNT two 30/40Model30 / 40HV–Heating flowG 1“HR

Pagina 3 - 120-393 632.4 04.08 Fh

Technical Data 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 113.2 Dimensions and connections PARAMOUNT two 60-115 Fig. 2: Dimensions and connect

Pagina 4 - 1. Regarding this Manual

Technical Data12 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhTable 2: Dimensions and connections PARAMOUNT two 60-115ModelParamount 60 DParamount 80

Pagina 5 - 2. Safety

Technical Data 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 133.3 Technical Data PARAMOUNT twoTable 3: Technical data PARAMOUNT twoModel PARAMOUNT

Pagina 6 - 2.4 Regulations and standards

Technical Data14 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh3.4 Wiring diagram

Pagina 7 - 2.5 C.E. Approvals

Technical Data 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 153.5 Sensor value tablesTable 4: Resistance values for outside temperature sensor ATF

Pagina 8 - 2.6 Conformity declaration

Before installation16 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh4. Before installation4.1 Combustion air supplyConcentric Flue ApplicationsThe air

Pagina 9 - 3. Technical Data

Before installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 174.2 Corrosion protectionThe combustion air must be free from corrosive elements

Pagina 10 - Technical Data

Before installation18 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh4.5 Notes for installation locationAttention! When first installing the PARAMOUNT t

Pagina 11

Before installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 194.7 Application example Application example: A pumped heat circuit with room co

Pagina 12

2 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhTable of contents1. Regarding this Manual. . . . . . . . . . . . . . . . . . . . . . .41.1 Content of t

Pagina 13

Before installation20 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh Connection plan

Pagina 14 - 3.4 Wiring diagram

Installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 215. Installation5.1 Connecting to the heating system Connect heating circuit with flat

Pagina 15 - 3.5 Sensor value tables

Installation22 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhThe enclosed assembly instruction for the flue system has to be ob-served. 5.5 Flue system

Pagina 16 - 4. Before installation

Installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 23– per 45° elbow = 0.50 m– per 30° elbow = 0.35 m– per 15° elbow = 0.20 mExisting Chimn

Pagina 17 - 4.3 System water quality

Installation24 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh5.7 Gas connectionThe connection of the gas must only be carried out by an approved gas in

Pagina 18 - 4.6 Clearances

Installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 25Attention! The boiler must not be operated at connecting pressu-res outside the given

Pagina 19 - 4.7 Application example

Installation26 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh5.10 Gas valve Fig. 5: Gas valve (setting for injector pressure with key Torx T15)Measur

Pagina 20

Installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 27Adjusting and Checking the CO2 valuesOperate the PARAMOUNT two in the controller stop

Pagina 21 - 5. Installation

Installation28 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh5.11 Guide Values for Injector PressureGuide values for gas flow, injector presure and CO2

Pagina 22 - 5.5 Flue system

Installation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 29International protection IPx4D The screwed cable connections have to be tightened in o

Pagina 23 - 5.6 Flue terminal positioning

120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 36. Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . 306.1 Switching on . . . . .

Pagina 24 - 5.7 Gas connection

Commissioning30 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh6. CommissioningDanger! The commissioning must only be carried out by a heating specialis

Pagina 25 - -Content

Commissioning 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 316.4 Programming of necessary parametersNormally, the control parameters do not have t

Pagina 26 - 5.10 Gas valve

Operation32 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh7. Operation7.1 Operation elementsFig. 9: Operating elementsLock-out reset buttonPressure ga

Pagina 27

Operation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 337.2 DisplaysMeaning of the displayed symbols Heating at comfort nominal valueHeating at

Pagina 28

Operation34 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhContinuous operation or – Heating operation without time programme– Protection functions ac

Pagina 29

Operation 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 35By pressing the information button, further information can be called up (see servicing

Pagina 30 - 6. Commissioning

Programming36 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh8. ProgrammingThe controller must be programmed after installation. 8.1 Programming procedu

Pagina 31 - Commissioning

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 378.2 Modification of parameters Settings, which are not directly modified via the front

Pagina 32 - Boiler temperature

Programming38 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhThe previous menu point will be called up by pressing the ESC-but-ton without taking over p

Pagina 33 - 7.3 Operation

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 39Operator section save basic settingsNo |YesThis parameter is only visible in the room d

Pagina 34 - ➜ Reduced nominal value

Regarding this Manual4 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh1. Regarding this ManualRead this instruction booklet thoroughly before operating

Pagina 35

Programming40 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh2nd phase ON523 E--:-- (h/min)2nd phase OFF524 E--:-- (h/min)3rd phase ON525 E--:-- (h/min)

Pagina 36 - 8. Programming

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 41Frost protection nominal value714 E10.0°CNominal line gradient720 E3.50Summer/winter he

Pagina 37 - Programming

Programming42 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhLegionella funct periodically1641 F3Legionella funct weekdayMonday | Tuesday | Wednesday |

Pagina 38 - OFF

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 43Relay output 3 RelClDefault | Message output | Alarm output | Omessage | External trans

Pagina 39

Programming44 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhConfigContr1.7F0LPBEquipment address6600 I1FaultSW Diagnosis code6705 EFA phase disturbance

Pagina 40

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 45Parameters with the program numbers 1-54 are individual parame-ters of the operating un

Pagina 41

Programming46 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh8.4 Explanations for setting table Time and dateTime and date (1 to 3) The control has a ye

Pagina 42

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 47Re-adjustment room sensor(54)The temperature display of the value, transmitted by the r

Pagina 43

Programming48 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhDetermination of the heating curve slopeEnter lowest calculated outside temperature accordi

Pagina 44

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 49no. 6110) an the temperature difference, by which the room tem-perature will be lowered

Pagina 45

Safety 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 52. SafetyDanger! Absolutely observe the following safety instructions! Otherwise, you may end

Pagina 46

Programming50 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhImportant! The respective regulations and standards of the screed manufacturer have to be o

Pagina 47

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 51Procedure to set the operating range of the modulating pump by the heating specialistIf

Pagina 48

Programming52 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fhon the time switching programs. Every time, the switching-on time will be moved forward by

Pagina 49

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 53If the colder storage temperature rises above the legionella func-tion setpoint -1 K, t

Pagina 50

Programming54 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhExternal transformer: This output serves to switch off an external transformer. The output

Pagina 51

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 55te switch). The modem function is activated when the contact is closed.Modem inverse: T

Pagina 52

Programming56 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fhas a flow setpoint. The maximum value will be set under prog. no. 5975.Specified capacity:

Pagina 53

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 57sensor is connected at the input, which must be installed in the flow behind the hydrau

Pagina 54

Programming58 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhMaintenance / ServiceMessage(7001)Messages to signal necessary maintenance work. The follow

Pagina 55

Programming 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 59The following messages are possible under Boiler:The following messages are possible un

Pagina 56

Safety6 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fhgas/air ratio is maintained over the total range of the boiler mo-dulation, and that constant CO2

Pagina 57

Programming60 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhState DHW The following messages are possible under DHW:State heating circuit 1/2 The follo

Pagina 58

General 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 619. General9.1 Room unit RGTRemote setting of all adjustable control functions of the basic

Pagina 59

Servicing62 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh10. ServicingDanger of electric shock! Before removing parts of the cover, the boiler has to

Pagina 60

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 6310.4 Removing gas burner The gas burner has to be dismantled before cleaning the heating

Pagina 61 - 9. General

Servicing64 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhDismantling of the gas burner (PARAMOUNT two 60 D)• Disconnect the connecting lines to the fa

Pagina 62 - 10. Servicing

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 65Dismantling of the gas burner (PARAMOUNT two 80 D)• Disconnect the connecting lines to th

Pagina 63 - 10.4 Removing gas burner

Servicing66 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhDismantling gas brenner (PARAMOUNT two 95/115)• Disconnect the connecting lines to the fan.•

Pagina 64

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 6710.6 Boiler view PARAMOUNT two Fig. 23: Boiler views PARAMOUNT two 30/40 (depicted wi

Pagina 65

Servicing68 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhFig. 24: Boiler views (depicted without front case and control cover)Sight glassFlue adapter

Pagina 66

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 69Fig. 25: Boiler views (depicted without front wall and control cover) Sight glassFlue ad

Pagina 67

Safety 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 7IM/II - Flues for commercial and Industrial Gas Fired Boilers and Air Heaters.IGE/UP/1 - Soun

Pagina 68

Servicing70 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh10.7 Dismantling the heat exchangerThe following work has to be carried out, if the heat exch

Pagina 69

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 71 10.9 Control and regulating centre LMUDescription of functionControl and monitoring of t

Pagina 70 - 10.8 Check electrodes

Servicing72 POTTERTON COMMERCIAL 120-393 632.4 04.08 FhBurner does not start:No voltage at the control and regulating centre, e.g. no “burner ON“ si

Pagina 71 - 1 2 0 - 3 9 1 0 2 1 . 4

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 7310.11 Fault code tableFault codeFault description Explanations/causes10Outside temperatur

Pagina 72

Servicing74 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh10.12 Operation phases of control and regulation centre LMU (Press information button)140Impe

Pagina 73 - 10.11 Fault code table

Servicing 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 7520Subsequent ventilation with last ope-rating fan speedFan continues to run21Subsequent v

Pagina 74 - (Press information button)

Commissioning report76 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh11. Commissioning report REPORT SENT TO INSTALLER:YES NOSITE VISIT COMMISSIONI

Pagina 75

Commissioning report 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 776.0 OPERATIONAL SAFETY CHECKS 6.1 Check control stat operation 6.2 Check lim

Pagina 76 - 11. Commissioning report

78 POTTERTON COMMERCIAL 120-393 001.4 04.08 FhIndexAActivate-basic settings 46Automatic day heating limit 33Automatic Operation 33Automatic summer/wi

Pagina 77 - Commissioning report

120-393 001.4 04.08 FhPARAMOUNT two 30 - 115 kW 79RReduced nominal value 34Replacing cables 29Restore standard values 35Restoring the factory setting

Pagina 78 - 120-393 001.4 04.08 Fh

Safety8 POTTERTON COMMERCIAL 120-393 632.4 04.08 Fh2.6 Conformity declarationParamount two 30 - 115

Pagina 79

Publication Date: 0411Baxi Commercial DivisionWood Lane, Erdington,Birmingham B24 9QPEmail: [email protected]

Pagina 80 - Publication Date: 0411

Technical Data 120-393 632.4 04.08 FhPARAMOUNT two 30 - 115 kW 93. Technical Data3.1 Dimensions and connections PARAMOUNT two 30/40 Fig. 1: Dimensi